@epsteinpedia
CA:
AEb4NmMJF2x5kcp19M13RiXZuAGyajWSKLaioqBrpump
Document DOJ-OGR-00015771
AI Analysis
Summary: A monthly maintenance checklist completed on February 14, 2005, covering various equipment and systems such as fire extinguishers, security alarms, and heating/cooling systems. The checklist ensures that necessary inspections and tasks are performed regularly. The document is signed but the signature is not provided.
Significance: This document reveals the maintenance routine and responsibilities for a specific facility or building, potentially relevant to a legal or regulatory case.
Key Topics:
Facility maintenance
Equipment inspection
Monthly checks
Full Text
CHECK EVERY MONTH
(Check list to be completed and signed by the 28th of each month)
Fire Extinguisher - Check to make sure that it is fully charged.
Security alarm - Test system.
Sink stoppers - Clean out debris, soak stoppers in vinegar and water to clean.
Garbage disposal - Flush with hot water and baking soda, put ice cubes through to sharpen.
Hot water heating system - Test relief valve and replace if necessary; check pressure gauge and drain expansion tank if necessary.
Steam heating system - Check safety valve and steam-pressure gauge and have replaced if necessary; check water-level gauge and add water if needed; drain water until clear to eliminate sediment.
Air conditioners / heaters - Clean or replace filter; clean condenser, evaporator coils and condensation drain.
DATE: 2/14/2005 SIGNATURE:
DOJ-OGR-00015771