@epsteinpedia
CA:
AEb4NmMJF2x5kcp19M13RiXZuAGyajWSKLaioqBrpump
Document DOJ-OGR-00026894
AI Analysis
Summary: The Daily Lieutenant's Log for August 9, 2019, documents the activities and events at the Metropolitan Correctional Center, including security checks, inmate movements, and equipment issues such as a malfunctioning fire alarm and public address system. Lieutenant C. Perez was on duty as the Day Watch Operations Lieutenant. The log details various inmate status updates and movements throughout the day.
Significance: This document provides a detailed account of the daily operations and events at the Metropolitan Correctional Center on August 9, 2019, highlighting security checks, inmate movements, and equipment malfunctions.
Key Topics:
Facility operations and security checks
Inmate movements and status updates
Equipment and system malfunctions
Key People:
- Lieutenant C. Perez - Day Watch Operations Lieutenant
- Lt. [b(6); (b)(7)(C)] - E/W Operations Lieutenant
Full Text
UNITED STATES DEPARTMENT OF JUSTICE
METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY
DAILY LIEUTENANT'S LOG
SHIFT-DAY-DATE: D/W - Friday, August 09, 2019 Beginning Count: [b(7)(F)] SHU [b(7)(F)]
D/W Daily Sensitive Information:
I/M [b(6); (b)(7)(C)] on Suicide Watch w/inmate companion
I/M [b(6); (b)(7)(C)] on Psych obs. w/inmate companion.
I/M [b(6); (b)(7)(C)] on DRY Cell w/staff watch in R&D.
8:00 AM Lieutenant C. Perez assumes duties as the Day Watch Operations Lieutenant. The fire alarm and pump system is inoperable at this time. Fire Watch is in Progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All equipment w/exception of Rear Gate "Soft Gate" is secure. Temporay Chit Inventory: [b(7)(F)] Hosp: 0 [b(7)(E); (b)(7)(F)] Daily Hand Stamp
8:00 AM NYPD Phone Check #2286
8:10 AM [b(7)(E)] Test Initiated.
8:30 AM Census Conducted
8:38 AM [b(6); (b)(7)(C)] E01-506L to PRE REMOVE [b(6); (b)(7)(C)] E02-513U to PRE REMOVE. [b(6); (b)(7)(C)] 06-220UAD to PRE REMOVE -3
8:50 AM [b(7)(E)] Testing Complete.
8:58 AM [b(6); (b)(7)(C)] K12-069U to L HOSP USM -1
10:00 AM [b(6); (b)(7)(C)] E08-562L FT REL -1
10:24 AM -1 I/M [b(6); (b)(7)(C)] from ES to GCT REL
11:24 AM [b(6); (b)(7)(C)] new commit +1
12:30 PM PM Census Conducted
12:35 PM [b(6); (b)(7)(C)] return from L-Hosp +1
1:10 PM I/M [b(6); (b)(7)(C)] off suicide watch
2:41 PM -1 I/M [b(6); (b)(7)(C)] from IN to TREATY TRANS
3:15 PM I/M [b(6); (b)(7)(C)] placed on dry cell from ZA
3:45 PM Institutional lockdown for count.
4:00 PM Relieved of duties by Lt. [b(6); (b)(7)(C)] E/W Operations Lieutenant.
Visitation: ZA
Inmates Adults Children Total
17 20 9 46
ION SCANNING TESTED HITS: 0
[b(7)(E); (b)(7)(F)] inquiry(s) was/were received during my tour of duty: 0
The following Inmate(s) were placed in Administrative Detention: 0
Name Reg Number Reason Unit TIME A/D Order
Ops Lt [b(6); (b)(7)(C)] Ending Count: [b(7)(F)] SHU [b(7)(F)] ; 10-South: [b(7)(F)] SHU OBS: 00; Local Hosp: 00; H/A OBS: [b(7)(F)] B/A OBS: 00; Dry Cell: [b(7)(F)]
Act Lt [b(6); (b)(7)(C)]